Customer Case Study: Lasko Metal Products |
|
|
Lasko Metal Products - Fort Worth, Texas
The following is an exerpt of the report provided by BJ Haffly at the conclusion of the laser alignment performed on Lasko's Merritt Davis 6" 46:1 barrel. Unlike most plastic industry facilities, Lasko equipment and machines were installed properly and the foundations for the machines met or exceeded OEM specifications. Sadly, this is not the norm.
|
|
Last Updated ( Tuesday, 27 September 2005 )
|
|
Read more...
|
|
|
Customer Case Study: Texas Instruments |
|
|
Dallas, Texas (2000 - 2001) TI built a new clean room facility, called DMOS-6, to manufacture the new 300mm wafer. The main DMOS-6 clean room is 120,000 sq./ft with four additional clean rooms branching from it, for a total of 152,000 sq./ft. DMOS-6 plans included a fully automated overhead wafer shuttle system to move large quantities of wafers through each process at multiple tooling stations. Such a plan would require all tools to be precisely aligned to each other and to the overhead shuttle system. BJ Haffly and Joe Harmon were contracted to use laser alignment to set up what has turned out to be the only laser-aligned clean room facility in the world.
|
|
Last Updated ( Tuesday, 27 September 2005 )
|
|
Read more...
|
|
|